WORK    ABOUT    CONTACT
BACK



BROOKS SECONDARY STUDIOS Brooks Secondary School in Powell River required two new modular classrooms as replacements for older buildings. AMCA worked closely with SD47 and a modular fabrication company to plan, construct, and install two fully accessible classrooms within a six month period. Despite the aggressive construction timeline, AMCA ensured that the new buildings were not ‘stock models’. Care was taken to colour coordinate the new classrooms to match the existing school.
TYPE 
+ Institutional New Build
YEAR 
+ 2023
BUILDER
+ Aurora Cascade


© AM.CA 2024    .    250-891-4663     .     #2-1218 Langley St, Victoria BC, V8W 1V9